| The Rolling Stock Code is of 2018 |
October 2022 (earlier the Mechanical Department (Workshops) Code) |
| Production Units are under the zone's PCME (Principal Chief Mechanical Engineer) |
Directly under the Board; headed by a GM (General Manager) |
| ICF (Integral Coach Factory) makes locomotives |
ICF — coaches/Vande Bharat; locos — CLW (Chittaranjan Locomotive Works), BLW (Banaras Locomotive Works), PLW (Patiala Locomotive Works) |
| RCF (Rail Coach Factory) is at Rae Bareli |
RCF — Kapurthala; MCF (Modern Coach Factory) — Rae Bareli |
| PUs use job costing |
PUs — batch costing; parts — job costing; foundry — process costing |
| Standard cost of POH (Periodical Overhaul) includes A+B+C |
Standard cost = average of Group A |
| Cost of stores on drawal |
On consumption |
| On-cost as % of material |
As % of direct labour (Para 620) |
| On-cost rate = last year's actual |
Rate = budget ÷ estimated direct labour |
| Year-end under/over-recovery up to 10% is fine |
Must be below 5% |
| Proforma on-cost on every job |
Only on work for outside parties |
| Depreciation — buildings 5%, plant 2% |
Buildings 2%, plant 5% |
| Labour rate — the year's average rate |
Monthly average hourly rate of the same month |
| Incentive bonus goes to on-cost |
Incentive is part of direct labour |
| Idle time is charged to the job |
Idle time goes to on-cost |
| Profit % = (AT − TT) ÷ AT (Allowed Time) |
÷ TT (Time Taken) |
| Work order of 6 digits, fresh from January |
8 digits, fresh from April |
| Pink job card — overtime |
Pink — replacement work |
| M.612 — requisition |
M.612 — route card; requisition M.611; process sheet M.608 |
| WMS (Workshop Manufacture Suspense) = Plan Head 71 |
WMS = 72; Stores Suspense = 71 |
| Completed jobs may remain in WMS at year-end |
The balance is only WIP (Para 629) |
| Loco POH → SMH 4 (Sub-Major Head) |
Locos SMH 3; coaches SMH 4 |
| A large WMS balance makes the Operating Ratio look worse |
The reverse — expenditure looks lower, the ratio looks misleadingly better |
| Detailed estimate for regular repairs |
Demands 05/06/07 — without an estimate |
| Advance for outside work 20% or ₹50 lakh — whichever is more |
Whichever is less |
| Only the estimated amount from an outside party |
Actual cost — even if higher |
| Preparation charge — 2% below ₹10 lakh |
5% below ₹10 lakh; 2% above |
| Full proforma on Defence stock |
No interest and depreciation |
| Daily hire = annual ÷ 365 |
÷ 270 working days; supervision 12.5% |
| Sanction valid up to 3 years |
Lapses if not started in 2 years (722) |
| Completion report — 10% savings to the CME |
Savings above 15% |