रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

Exam Traps and Revision at a Glance

Workshop Accounts • Part 12 / 14 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. The most common confusions — with the correct answer
  2. Numbers at a glance

First sub-topic (sample)

1The most common confusions — with the correct answer

Wrong belief Correct fact
The Rolling Stock Code is of 2018 October 2022 (earlier the Mechanical Department (Workshops) Code)
Production Units are under the zone's PCME (Principal Chief Mechanical Engineer) Directly under the Board; headed by a GM (General Manager)
ICF (Integral Coach Factory) makes locomotives ICF — coaches/Vande Bharat; locos — CLW (Chittaranjan Locomotive Works), BLW (Banaras Locomotive Works), PLW (Patiala Locomotive Works)
RCF (Rail Coach Factory) is at Rae Bareli RCF — Kapurthala; MCF (Modern Coach Factory) — Rae Bareli
PUs use job costing PUs — batch costing; parts — job costing; foundry — process costing
Standard cost of POH (Periodical Overhaul) includes A+B+C Standard cost = average of Group A
Cost of stores on drawal On consumption
On-cost as % of material As % of direct labour (Para 620)
On-cost rate = last year's actual Rate = budget ÷ estimated direct labour
Year-end under/over-recovery up to 10% is fine Must be below 5%
Proforma on-cost on every job Only on work for outside parties
Depreciation — buildings 5%, plant 2% Buildings 2%, plant 5%
Labour rate — the year's average rate Monthly average hourly rate of the same month
Incentive bonus goes to on-cost Incentive is part of direct labour
Idle time is charged to the job Idle time goes to on-cost
Profit % = (AT − TT) ÷ AT (Allowed Time) ÷ TT (Time Taken)
Work order of 6 digits, fresh from January 8 digits, fresh from April
Pink job card — overtime Pink — replacement work
M.612 — requisition M.612 — route card; requisition M.611; process sheet M.608
WMS (Workshop Manufacture Suspense) = Plan Head 71 WMS = 72; Stores Suspense = 71
Completed jobs may remain in WMS at year-end The balance is only WIP (Para 629)
Loco POH → SMH 4 (Sub-Major Head) Locos SMH 3; coaches SMH 4
A large WMS balance makes the Operating Ratio look worse The reverse — expenditure looks lower, the ratio looks misleadingly better
Detailed estimate for regular repairs Demands 05/06/07 — without an estimate
Advance for outside work 20% or ₹50 lakh — whichever is more Whichever is less
Only the estimated amount from an outside party Actual cost — even if higher
Preparation charge — 2% below ₹10 lakh 5% below ₹10 lakh; 2% above
Full proforma on Defence stock No interest and depreciation
Daily hire = annual ÷ 365 ÷ 270 working days; supervision 12.5%
Sanction valid up to 3 years Lapses if not started in 2 years (722)
Completion report — 10% savings to the CME Savings above 15%
Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: The Chittaranjan Pattern in Detail, Overtime and Shop-Floor Control of MaterialAll parts — Workshop AccountsNext: Workshops and Production Units — Costing, WMS Budget and Incentive (Points Missed in the 2024 Paper) ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क