1The Chittaranjan pattern — basics
In simple wordsThe incentive scheme of railway workshops was first run at the CLW (Chittaranjan Locomotive Works), so it is called the Chittaranjan pattern. Its yardstick is time — an artisan who does good work in less than the allowed time is paid for the time saved.
| Feature | Rule |
|---|---|
| Yardstick | Time — an allowed time for every operation |
| Basic wage | Protected — not cut even if the work is slow |
| Average artisan | The allowed time is set so that an artisan of average ability can earn a bonus of 33⅓% |
| Ceiling | Bonus/profit not more than 50% |
| Indirect staff | Essential indirect staff — 80% of the average of the direct artisans of their section; supervisors' bonus at a separate rate, linked to the shop's performance |
| Quality | Payment only on work passed in inspection |
| Loss of time | Time lost on one job is set off against the savings of the same month |
The Chittaranjan pattern of incentive uses time as its yardstick: every operation has an allowed time, and a worker who finishes in less time earns a bonus for the time saved. The basic wage is protected, so a slow worker is not paid below his basic wage.
The allowed time is fixed so that an average artisan can earn a bonus of 33⅓ per cent, and the bonus is capped at 50 per cent. Essential indirect staff get 80 per cent of the average bonus of the direct artisans in their section, and supervisors are paid at a separate rate linked to the shop's performance. Payment is made only for work passed in inspection, and time lost on one job is set off against savings on other jobs in the same month. For example, if 260 hours are allowed and 160 taken, the profit is 62.5 per cent, but only 50 per cent (80 hours) is paid.
Solved exampleIn a month an artisan's jobs have a total allowed time of 260 hours and he takes 160 hours. Saving 100 hours; profit = 100 ÷ 160 = 62.5% → ceiling 50% → payment for 160 × 50% = 80 hours. Hourly rate ₹250 → incentive ₹20,000.
Essential indirect staff of the same section (such as a crane driver) — if the section's average profit is 40% → 80% × 40% = 32%.
- Group incentive scheme — in some workshops/production units the bonus is linked to the output of the whole group or shop, not to each artisan's time; this naturally brings indirect staff in as well.
Exam trapThe average artisan's bonus is 33⅓%, the maximum 50%, indirect staff 80% — the three figures are asked by swapping them around.