The Chittaranjan Pattern in Detail, Overtime and Shop-Floor Control of Material

Workshop Accounts • Part 11 / 14 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. The Chittaranjan pattern — basics
  2. Hours of work and overtime
  3. Control of material on the shop floor
  4. Getting work done outside (outsourcing)
  5. Chittaranjan system vs Group Incentive — full comparison (Rolling Stock Code 2022, Annexure 4.2)
  6. Gate attendance, overtime, WISE and some workshop terms

First sub-topic (sample)

1The Chittaranjan pattern — basics

In simple words

The incentive scheme of railway workshops was first run at the CLW (Chittaranjan Locomotive Works), so it is called the Chittaranjan pattern. Its yardstick is time — an artisan who does good work in less than the allowed time is paid for the time saved.

Feature Rule
Yardstick Time — an allowed time for every operation
Basic wage Protected — not cut even if the work is slow
Average artisan The allowed time is set so that an artisan of average ability can earn a bonus of 33⅓%
Ceiling Bonus/profit not more than 50%
Indirect staff Essential indirect staff — 80% of the average of the direct artisans of their section; supervisors' bonus at a separate rate, linked to the shop's performance
Quality Payment only on work passed in inspection
Loss of time Time lost on one job is set off against the savings of the same month
In detail

The Chittaranjan pattern of incentive uses time as its yardstick: every operation has an allowed time, and a worker who finishes in less time earns a bonus for the time saved. The basic wage is protected, so a slow worker is not paid below his basic wage.

The allowed time is fixed so that an average artisan can earn a bonus of 33⅓ per cent, and the bonus is capped at 50 per cent. Essential indirect staff get 80 per cent of the average bonus of the direct artisans in their section, and supervisors are paid at a separate rate linked to the shop's performance. Payment is made only for work passed in inspection, and time lost on one job is set off against savings on other jobs in the same month. For example, if 260 hours are allowed and 160 taken, the profit is 62.5 per cent, but only 50 per cent (80 hours) is paid.

Solved example

In a month an artisan's jobs have a total allowed time of 260 hours and he takes 160 hours. Saving 100 hours; profit = 100 ÷ 160 = 62.5% → ceiling 50% → payment for 160 × 50% = 80 hours. Hourly rate ₹250 → incentive ₹20,000.

Essential indirect staff of the same section (such as a crane driver) — if the section's average profit is 40% → 80% × 40% = 32%.

Exam trap

The average artisan's bonus is 33⅓%, the maximum 50%, indirect staff 80% — the three figures are asked by swapping them around.

Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Machinery & Plant Programme, Types of Maintenance and Workshop ModernisationAll parts — Workshop AccountsNext: Exam Traps and Revision at a Glance ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क