रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

Machinery & Plant Programme, Types of Maintenance and Workshop Modernisation

Workshop Accounts • Part 10 / 14 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. What the Machinery & Plant (M&P) programme is
  2. Justification of the proposal — what Accounts looks at
  3. Central purchase — COFMOW
  4. Types of maintenance — terms
  5. Measures of a workshop's performance
  6. Accounting records of machines

First sub-topic (sample)

1What the Machinery & Plant (M&P) programme is

In simple words

A workshop's lathes, cranes, presses and welding sets are its M&P (Machinery and Plant). Whether a new machine is to be bought or an old one replaced, the proposal goes into the annual M&P programme, which is part of the Works, Machinery and Rolling Stock Programme (the Pink Book).

Plan Head Subject
21 Rolling stock (locomotives, coaches, wagons)
41 Machinery and plant
42 Workshops — including production units
In detail

The Machinery and Plant programme is one of three linked plan heads that finance workshop assets. Plan Head 21 covers rolling stock — locomotives, coaches and wagons. Plan Head 41 covers machinery and plant, the machines used in workshops and sheds.

Plan Head 42 covers the workshops themselves, including production units. Keeping these separate lets the Board see how much is being spent on new rolling stock, on the machines that maintain it, and on the buildings and facilities that house that work. A common confusion is between 41 and 42: 41 is the machine, 42 is the workshop.

  • Large machines appear in the Pink Book as separate items; small machines through a lump-sum grant, within the powers of the General Manager/Divisional Railway Manager.
  • Source of funds — new/additional machine → Capital; replacement of an old one → DRF (Depreciation Reserve Fund).
Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Types of On-cost, Costing Methods, Outturn Statement, WMS Budget and Workshop PlanningAll parts — Workshop AccountsNext: The Chittaranjan Pattern in Detail, Overtime and Shop-Floor Control of Material ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क