रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

Workshops and Production Units — Costing, WMS Budget and Incentive (Points Missed in the 2024 Paper)

Workshop Accounts • Part 13 / 14 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. Costing systems in Production Units (PUs)
  2. Workshop organisation, time office and incentive
  3. M&P, T&P and road vehicles (Rolling Stock Code, October 2022)
  4. Outside work and the WMS budget

First sub-topic (sample)

1Costing systems in Production Units (PUs)

In simple words

PUs (such as CLW, ICF, RCF, BLW) build locomotives and coaches. Only when the real cost of each is known can Railway Board decide whether to make or buy — that is the core purpose of cost accounting.

Purpose and systems (all three statements correct — 2024 key)

  1. Purpose — find the manufacturing cost of each item of rolling stock, so that decisions on acquiring rolling stock rest on a rational and scientific basis.
  2. System depends on the work — process costing for wheel manufacture, foundry and similar continuous activities; batch costing for rolling-stock production.
  3. ERP — costing becomes much easier with ERP in all PUs and workshops; for this, the Board, PUs and zones need digitised data of every asset from proposal to condemnation, and every expense on making and maintaining each mechanical asset must be on the system.

Batch costing — completion report

Work orders in PUs — only two kinds

Transfer price — all three statements correct

  1. Fixed for each product on the actual cost of the previous year (cost report), plus escalation in direct labour, stores etc.; it is the basis for transferring debits through Railway Board to other railways for rolling stock supplied.
  2. Transfer prices are provisionally predetermined prices advised by PUs to Railway Board for approval in budget reviews, and must conform to Government Accounting Standards.
  3. For a new type of rolling stock, the transfer price is fixed from the estimate, using current labour rates, current direct stores and prevailing overhead percentages; credit for stock dispatched is taken at this price.

Component costing

Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Exam Traps and Revision at a GlanceAll parts — Workshop AccountsNext: Question-Bank Digest — Workshop Accounts, WMS, On-cost, Incentive and RSP/M&P ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क