Contracts and Tenders

General Expenditure • Part 6 / 10 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. Types of contracts (Engineering Code Chapter XII)
  2. Types of tenders
  3. Eligibility and bid capacity (GCC-2022 Part I, Para 10)
  4. Securities and preferences
  5. Tender Committee and reasonableness of rates
  6. Solved example — amounts from tender to contract
  7. E-tendering (IREPS) — from the Accounts angle

First sub-topic (sample)

1Types of contracts (Engineering Code Chapter XII)

In simple words

The type of contract is chosen to suit the nature of the work — lump sum if quantities are fixed in advance; item rate if quantities may vary; zonal contracts for repeated small jobs.

Type Form When suitable
Lump sum A fixed amount for the whole work Quantities of work are fixed in advance
Schedule / item rate A rate for each item; payment = actual quantity × rate The most common
Percentage rate A percentage (above/below) on USSOR (Unified Standard Schedule of Rates) rates Works with standard items
Piece work Rate per unit without fixing the quantity Small, repetitive jobs
Zonal All small works and maintenance of an area to one contractor for a fixed period Maintenance; normally 1 year (longer with the concurrence of Accounts)
EPC (Engineering, Procurement and Construction) Design, procurement and construction to one contractor, at a lump-sum price Large projects
In detail

The type of contract decides how the contractor is paid and who carries the risk of quantities changing. In a lump-sum contract a fixed amount is paid for the whole work, so it suits works whose quantities are known in advance. In a schedule or item-rate contract, the most common type, a rate is agreed for each item and payment is actual quantity × rate, so the Railway pays for what is actually done.

A percentage-rate contract quotes a percentage above or below the USSOR rates and suits works made of standard items. Piece work fixes a rate per unit without fixing the quantity, for small repetitive jobs. A zonal contract gives all the small works and maintenance of an area to one contractor for a fixed period, normally one year (longer with the concurrence of Accounts). An EPC contract hands design, procurement and construction to a single contractor at a lump-sum price, and is used for large projects.

Example (percentage rate)

Value of work at USSOR ₹80 lakh; the contractor quoted "6% above USSOR" → contract value = 80 × 1.06 = ₹84.8 lakh; every item is paid at the USSOR rate × 1.06.

Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Works — Estimates, Sanction and Register of WorksAll parts — General ExpenditureNext: GCC-2022 — Securities, Sub-contracting, Time, LD, Bonus and Variation in Quantities ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क