10.1Provision of Rolling Stock (Para 208–209)
In simple wordsIn a project designed for additional traffic, the cost of Rolling Stock (engines/coaches/wagons) is also added.
- In New Lines and Line Capacity works justified on the basis of additional traffic, the cost of rolling stock must be mandatorily included in the initial cost for evaluation; return should be measured on the total initial cost including rolling stock (208).
- Requirement of rolling stock — based on the freight and passenger traffic forecasts of the Planning Directorate of the Board; adjusted according to Wagon Turn-round, sickness provision, and busy season requirements (209).
- If an entirely new type of rolling stock is to be purchased/manufactured, a detailed financial appraisal of the proposed investment — whether it yields the expected return or not (209).