रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

Preliminary Records — Muster Roll and Measurement Book (Engineering Code Chapter XIII)

Works Expenditure • Part 14 / 24 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. What are Preliminary Records (1301-E)
  2. Muster Sheet / Muster Roll (1302–1311-E)
  3. Measurement Book (Measurement Book — MB) — 1313–1326-E
  4. Contractor's Measurement Book (CMB) — Para 1316A (ACS 50)
  5. Contracts with PMS/PSSA — Para 1316B (ACS 63, 02.08.2024)
  6. Measurement of Ballast — 1332–1333-E
  7. e-Measurement Book (e-MB)

First sub-topic (sample)

14.1What are Preliminary Records (1301-E)

In simple words

Preliminary records = records on which payments are based — Muster roll (wages) and Measurement book (measurement of work).

Those original records of the Engineering department on the basis of which payments are made — (a) Workers' wages (muster sheet/roll), (b) Suppliers and contractors payments (measurement book, bills).

Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Execution of Works (Engineering Code Chapter XI)All parts — Works ExpenditureNext: Contractors' Bills, Advances, Recoveries and Contractors' Ledger ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क