Execution of Works (Engineering Code Chapter XI)

Works Expenditure • Part 13 / 24 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. Modes of Execution
  2. Main Paras of Chapter XI
  3. Project Management Consultant (PMC/PMS/PSSA)
  4. Released Materials and Material Reconciliation
  5. Quality and Control
  6. Role of Accounts (Finance) in Execution Stage

First sub-topic (sample)

13.1Modes of Execution

In simple words

Ways of getting works executed — through contract, departmentally (through own labour), or through PSU/agency.

Types of contracts — same work, different payment methods: Suppose an earthwork embankment of 1,000 cubic metres is to be constructed.

Summary Table

Mode Description
Departmental Railway's own staff/muster roll labourers, own materials — now limited (maintenance, emergencies)
Through Contract Most works — E-tender (IREPS — Indian Railways E-Procurement System), on GCC (General Conditions of Contract) terms; Item rate / Percentage on SOR, Lump sum, EPC (Engineering, Procurement and Construction — major projects)
Through Railway PSUs/Agencies RVNL (Rail Vikas Nigam Limited), IRCON, RITES (Rail India Technical and Economic Service), DFCCIL (Dedicated Freight Corridor Corporation of India Limited) etc. — on behalf of the Ministry of Railways
Deposit Works At the cost of an external party (page 17)
Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Delegation of Powers — GM, DRM, CAO/C (Construction)All parts — Works ExpenditureNext: Preliminary Records — Muster Roll and Measurement Book (Engineering Code Chapter XIII) ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क