रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

Advances to Staff, SRPF/NPS and Arrear Claims

General Expenditure • Part 4 / 10 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. Advances to employees
  2. Accounts of the Provident Fund (SRPF) and NPS
  3. Arrear claims and delays (A&F Paras 1018–1025)
  4. House Building Advance (HBA) — interest and conditions
  5. Unified Pension Scheme (UPS) — an option within NPS
  6. Recovery of overpayments — limits (Rafiq Masih judgment)
  7. Central Government Employees Group Insurance Scheme (CGEGIS)

First sub-topic (sample)

1Advances to employees

In simple words

For some large expenses (house, computer, travel, treatment) the employee is paid money in advance, which is recovered later in instalments or adjusted against a claim.

Advance Amount Recovery / condition
House Building Advance (HBA) 34 months' Basic Pay or ₹25 lakh or the cost of the house or the repaying capacity — whichever is least Principal in 180 monthly instalments, then interest in 60 instalments (20 years in all); simple interest, the rate is announced by the Government every year; insurance of the house and mortgage in favour of the Government
Computer advance ₹50,000 or the actual price, whichever is less At most 5 times in the whole service; with interest
TA / transfer advance A prescribed part of the estimated claim Adjusted against the claim
Medical advance As per the estimated cost of treatment Adjusted against the reimbursement claim
Temporary Advance / Final Withdrawal from SRPF (State Railway Provident Fund) Within the limits of purpose, length of service and the balance in the account The advance is repaid in instalments; a final withdrawal is not repaid
In detail

Employees can draw several kinds of advance, each with its own limit and recovery. The House Building Advance is the least of 34 months' Basic Pay, ₹25 lakh, the cost of the house and the repaying capacity. The principal is recovered in 180 monthly instalments and the simple interest afterwards in 60, so recovery runs 20 years in all; the house is insured and mortgaged to the Government.

A computer advance is ₹50,000 or the actual price, whichever is less, and can be taken at most five times in a career, with interest. TA, transfer and medical advances are a portion of the estimated claim and are adjusted against the final claim. From the SRPF, an employee may take a temporary advance, which is repaid in instalments, or a final withdrawal, which is not repaid; both depend on the purpose, length of service and the balance in the account.

  • After the 7th Pay Commission, interest-free advances such as festival, natural calamity and cycle advances were abolished.
  • The Accounts Department keeps an advance register/ledger, reconciles recoveries every month, and ensures recovery of outstanding advances before retirement.
Example (HBA)

Basic pay ₹60,000 → 34 months = ₹20.4 lakh; cost of the house ₹40 lakh; ceiling ₹25 lakh. The lowest is ₹20.4 lakh — if the repaying capacity is not lower than this, this is the advance admissible.

Solved example (HBA amount)

Basic Pay ₹60,000; cost of the house ₹30 lakh; ₹22 lakh on the basis of repaying capacity.

Options — 34 × 60,000 = ₹20.4 lakh; ceiling ₹25 lakh; cost ₹30 lakh; capacity ₹22 lakh → least = ₹20.4 lakh.

Principal instalment = 20,40,000 ÷ 180 ≈ ₹11,333 per month (15 years); after that, interest in 60 instalments.

Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Establishment Claims, Court Attachment, Travelling Allowance and TransferAll parts — General ExpenditureNext: Works — Estimates, Sanction and Register of Works ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क