Basic sourcesCode for the Mechanical Department; Accident Manual (ART/ARME); operating rules for the 140-tonne breakdown crane (RDSO); Board's instructions on mechanical work in divisions. Classification of accidents and target times — T.7.
1Organisation of the Mechanical Department
In simple wordsThe structure of the mechanical department — from the Board to the division, responsible for maintaining locomotives, coaches and wagons.
Summary table
| Level | Officers | Main work |
|---|---|---|
| Board | Member (Traction & Rolling Stock); mechanical directorates | Rolling stock policy, maintenance standards, production programme |
| Zone | Principal Chief Mechanical Engineer (PCME); CRSE (coaches/wagons), CMPE (diesel), CWM (workshops) | Supervising depots, sheds and workshops, materials, safety |
| Division | Senior Divisional Mechanical Engineer (Sr DME) — C&W, diesel; ADME/AME | Coaching depots, sick lines, ROH depots, train examination, diesel sheds, ART/ARME, cranes |
| Workshop / Production Unit | Chief Workshop Manager (CWM), AWM; GM of the PU | POH, manufacture, quality |
2Divisional Work — Timetable, Control and Rolling Stock
In simple wordsThe mechanical department's work in a division — time for maintenance of rakes in the timetable, its role in control.
- Role in the WTT: time for primary/secondary maintenance of coaching rakes (pit line occupation), the maintenance window in rake links; capacity of freight examination points.
- Mechanical control (C&W/power): hot axles, brake binding, train parting, coach failures en route — managing examiners/repair teams; sending wagons due for ROH/POH to depots; watch over invalid BPCs.
- Train examination: pre-departure examination of passenger trains (BPC), rolling-in/rolling-out inspection; CC/premium/end-to-end patterns of goods trains — T.3.
3Accident Relief — ART, ARME and Cranes
In simple wordsAccident relief — the ART (relief train), the ARME (medical van) and heavy cranes.
- ART (Accident Relief Train): equipment according to its class — hydraulic re-railing equipment (HRE), jacks, cutting equipment, lighting, generators, rescue equipment; always ready, regular mock drills. Self-propelled ART (SPART) and medical van (SPARMV) — quick departure.
- Target times: ART 30 minutes by day / 45 minutes by night; ARME 15 minutes from a double-exit siding, 25 minutes from a single exit (from the hooter).
- 140-tonne breakdown crane: lifting/removing derailed heavy vehicles; operating rules — outriggers, load chart (capacity by radius), power block in OHE areas, care on gradients; trained crane drivers; regular load tests.
- Restoration: first save lives, then preserve evidence (wheel measurements, brake position, couplers, joint note), then remove the vehicles and clear the line.
4Accident Relief — Readiness of the ART, ARME and Cranes (in Detail)
| Arrangement | Key points |
|---|---|
| ART (Accident Relief Train) | Re-railing equipment (hydraulic jacks, re-railing blocks), cutting equipment, lighting, generators, communication; always ready to leave within the prescribed time — regular "mock drills" |
| ARME/SPART (Accident Relief Medical Equipment) | First aid, medical team; for rescuing passengers |
| 140-tonne breakdown crane | Lifting overturned/heavy vehicles; lifting only within the crane's load-radius table (radius vs capacity); power block in OHE areas |
| Siren signals | Prescribed hooter codes for calling out the ART/ARME |
Solved example (principle of crane capacity)A crane's capacity falls as the radius increases. Suppose the table gives 140 tonnes at a 6 m radius, but much less at 10 m. An overturned locomotive (weight ~120 tonnes) lies 9 m away — so the crane must be moved closer (after restoring the track) or a "tandem lift" with two cranes used — never beyond the table.
5Divisional Work — WTT, Control and the Divisional Mechanical Department
- In the Working Time Table (WTT), rake links and time for primary/secondary maintenance — the mechanical department's agreement is necessary, so that enough time is available on the pit line;
- mechanical controller in the control office — immediate decisions on reports of hot axles, brake binding, coach defects (detaching the vehicle, restricted speed up to the repair station);
- indices: defects found in rolling-in/out examination, failures en route, "ineffective" percentage of coaches/wagons, POH arrears.
RememberQuick revision —
- Board — Member (Traction & Rolling Stock); zone — PCME; division — Sr DME; workshop — CWM.
- Division: WTT/pit lines, mechanical control, train examination, wagons due for ROH/POH.
- ART 30/45 minutes; ARME 15/25 minutes; SPART, SPARMV.
- 140-tonne crane — load chart, outriggers, power block in OHE.
Exam trap
- Head of mechanical in the Board — Member (Traction & Rolling Stock); zone — PCME; division — Sr DME.
- ART 30/45 minutes (day/night); ARME 15/25 minutes (double/single exit).
- Power block before working a crane in an OHE area.