रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

New Lines, Geometric Standards and Track Structure

Railway Civil Engineering — Permanent Way, Bridges & Works (Part B) • Part 1 / 9 • AEN (सिविल) full part free

हिंदी में पढ़ें

In this part

  1. New Lines — Surveys and Geometric Standards
  2. Track Structure — Components and Their Functions
  3. Solved Examples — Degree of Curve and Grade Compensation
Basic sources

Indian Railways Permanent Way Manual (IRPWM 2020 and correction slips); Engineering Code (surveys); Schedule of Dimensions (SOD); Railways Act 1989 (Sections 20–23, opening of new lines); RDSO's track standards. For the sequence of surveys, also see FR.3.

1New Lines — Surveys and Geometric Standards

In simple words

A new line — surveys (RECT, etc.) and geometric standards (gradients, curves, etc.).

Sequence: RECT — Reconnaissance Engineering-cum-Traffic survey (alternatives from maps/satellite) → PECT — preliminary survey (alignment, cost, traffic) → FLS — Final Location Survey (pegs, L-section, cross-sections, positions of bridges and stations) → DPR and sanction → land acquisition, construction, CRS inspection, opening for passenger traffic.

Standard Essence
Ruling gradient The gradient that determines the load of the section; on BG in plains usually 1 in 150 to 1 in 200; steeper in hills; new lines/DFCs on easier gradients
Grade compensation on curves The extra resistance of a curve — on BG 0.04% per degree of curve, so that the total resistance on a curve does not exceed the ruling gradient
Station yards Maximum 1 in 400; desirable 1 in 1200 — so that standing vehicles do not roll
Schedule of Dimensions (SOD) Maximum moving dimensions and minimum/maximum dimensions of structures (platforms, OHE, bridges, tunnels); any infringement — only with the Board's sanction and the CRS's permission

Opening a new line: sanction of the Central Government under the Railways Act, given after inspection and certification by the Commissioner of Railway Safety (CRS); certificates for track, bridges, signals, OHE, SOD — all, and speed trials (speed trial/OMS). The CRS's sanction is also needed for new works affecting a running line (yard remodelling, new bridges, doubling).

2Track Structure — Components and Their Functions

In simple words

The components of the track — rails, sleepers, fastenings, ballast, formation — and the job of each.

Summary table

Component Present standard (main lines) Function
Rail 60 kg/m (60E1), 880/1080 grade (head-hardened — heavy traffic and sharp curves); long rails (flash-butt welded panels from the plant) Guiding the wheels, transmitting the load to the sleepers, the electrical/signal circuit
Sleeper PSC monoblock; density usually 1660 per km (less on less important lines) Maintaining gauge, transmitting the load to the ballast, lateral/longitudinal stability
Fastenings Elastic rail clips (ERC), GFN liners, rubber pads Fastening the rail to the sleeper elastically, absorbing vibration, electrical insulation
Ballast Sharp-edged broken stone (standard size); cushion below the sleeper usually 300–350 mm (350 mm on heavy axle-load/high-speed routes) Load distribution, drainage, lateral resistance (essential for LWR), resilience
Formation Prepared sub-grade including blanket (CE.4) Final load bearing, stability

3Solved Examples — Degree of Curve and Grade Compensation

Formula

(BG, 30.5 m chord) Radius of curve R (m) ≈ 1,750 ÷ D (degrees) — i.e. D ≈ 1,750 ÷ R.

Example 1

R = 875 m → D = 1,750 ÷ 875 = 2°. R = 1,750 m → 1°; R = 350 m → 5° (a sharp curve).

Example 2 (grade compensation)

The ruling gradient of a section is 1 in 200 (= 0.5%). A 2° curve lies on it.

  • Compensation = 0.04% × 2 = 0.08%;
  • maximum permissible gradient on the curve = 0.5 − 0.08 = 0.42% ≈ 1 in 238;
  • i.e. the gradient on the curved portion has to be kept easier, so that curve resistance + grade resistance together stay equal to the ruling gradient.
Remember

The gradient in station yards is a maximum of 1 in 400 (desirable 1 in 1,200) — the reason is not curves but preventing standing vehicles from rolling.

Remember

Quick revision —

  • Surveys: RECT → PECT → FLS → DPR → construction → CRS inspection → opening.
  • Curve compensation BG 0.04%/degree; station yards maximum 1:400 (desirable 1:1200).
  • SOD infringement — permission of the Board + CRS.
  • Standards: 60E1 rails, PSC 1660/km, ERC, ballast 300–350 mm.
  • Route groups A–E; upgrading for 25 tonnes and 130/160 km/h.
Exam trap
  • Sequence of surveys — RECT → PECT → FLS → DPR.
  • Curve compensation on BG 0.04% per degree.
  • An SOD infringement needs the permission of both the Board and the CRS.
Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
All parts — Railway Civil Engineering — Permanent Way, Bridges & Works (Part B)
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क