रेल डिपार्टमेंटल तैयारीRail Departmental Taiyari — रेलवे विभागीय परीक्षाओं की तैयारीLogin / Open app

Provisioning and Inventory Management

Stores / Materials Management • Part 8 / 11 • Appendix-III A IREM Examination

हिंदी में पढ़ें

In this part

  1. Provisioning — how much and when to order
  2. EOQ — Economic Order Quantity
  3. Re-order level (ROL)
  4. Demand forecasting
  5. Techniques of inventory control
  6. Indicators
  7. More forecasting methods — weighted average and exponential smoothing
  8. Common mistakes in provisioning

First sub-topic (sample)

1Provisioning — how much and when to order

In simple words

The question of provisioning is simple — "consumption for the time new supply will take to arrive (lead time) + consumption for the fixed period ahead (coverage period) + a little safety stock — minus whatever is already in stock or on order."

Formula

Quantity to be ordered = estimated consumption during (lead time + coverage period) + safety stock − (current stock + dues-in)

Term Meaning
AAC (Anticipated Annual Consumption) From the average consumption of the last three years, excluding abnormal demands; adjusted for future programmes (new coaches, electrification)
Lead time From the demand being raised until the goods are accepted in the depot — administrative (tender, acceptance) + supply (manufacture, transport) + inspection
Coverage period For how long one order must meet the requirement
Safety stock For uncertainty in demand and lead time; higher for Vital items
Max-min system As soon as the minimum (re-order) level is reached, an order to fill up to the maximum level
Annual review Major items together, once a year — consolidated large orders, better rates
In detail

Provisioning decides how much to order and when. The Anticipated Annual Consumption is based on the average of the last three years, leaving out abnormal demands and adjusting for future programmes such as new coaches or electrification. The lead time is the whole period from raising a demand to accepting the goods in the depot — administrative time for tender and acceptance, supply time for manufacture and transport, and inspection.

The coverage period is how long one order must last. Safety stock guards against uncertainty in demand and lead time, and is higher for vital items. Under the max-min system, an order is placed as soon as stock falls to the minimum (re-order) level, to bring it up to the maximum. An annual review of major items consolidates orders, which brings better rates.

Solved example

AAC = 12,000 units (1,000 a month); lead time 6 months; coverage period 12 months; safety stock 2 months; current stock 3,000; dues-in 4,000.

Requirement = (6 + 12 + 2) × 1,000 = 20,000.

Demand = 20,000 − (3,000 + 4,000) = 13,000 units.

Exam trap

Never forget to deduct dues-in (what is yet to arrive) — forgetting it is the most common cause of over-stocking.

Full preparation in the app

All parts in Hindi + English, subject-wise MCQs and mock tests — create a free account.

Start free
‹ Previous: Codification, Standardisation, Stock Verification and Stores AccountsAll parts — Stores / Materials ManagementNext: Disposal of Unserviceable Stores and IT Platforms ›
All exams & subjects (Hindi) • Login • शिक्षक भर्ती (RPSC / REET) नोट्स • Telegram channel • गोपनीयता नीति • नियम व शर्तें • संपर्क