Basic sourcesIndian Railways Operating Manual (chapter on the control organisation); General and Subsidiary Rules (G&SR); zonal operating manuals; Board's circulars. While reading the figures, remember that designations and organisation change from time to time.
1Organisation of the Transportation (Operating) Department
In simple wordsThe structure of the operating department — from the Board to the division, responsible for running trains.
Summary table
| Level | Head | Main work |
|---|---|---|
| Railway Board | Member (Operations & Business Development); Additional Members (Traffic/Business Development), Executive Directors | Policy, coordination of timetables, all-India allotment of wagons and locomotives, freight targets, safety instructions |
| Zone | Principal Chief Operations Manager (PCOM); CFTM, CPTM, CTPM, CMPE, Chief Safety Officer (safety a separate department) | Zonal planning, inter-zonal interchange, power plan, timetable, control over major yards |
| Division | Senior Divisional Operations Manager (Sr DOM); DOM, AOM; divisional control office | Day-to-day train running, crew and rake management, inspection of stations, safety |
| Station/yard | Station Superintendent/Master, Yard Master, Pointsman, shunting staff, Guard (Train Manager) | Reception and despatch of trains, block working, shunting, marshalling |
Your role as an AOM: supervising the control office, planning blocks/power blocks, first response to accidents, inspecting stations and yards, counselling staff and safety drives. An officer who has come up from Group C is expected to know the rules and also to explain the reason behind a rule.
2The Control Organisation
In simple wordsControl office = the division's 24-hour "brain" — watching every train, locomotive and rake.
The divisional control office is a "nerve centre" working 24×7 — information about every train, every locomotive, every rake and every unusual incident passes through it.
| Board / controller | Work |
|---|---|
| Deputy Chief Controller (Dy CHC) / Chief Controller | Shift in-charge of the whole division; major decisions, ordering the ART/ARME in an accident, informing officers |
| Section controller | Order of trains in his section, crossing-precedence, actual running on the chart (now on COA) |
| Goods controller (TNC/Goods) | Allotment of rakes, loading-unloading, interchange, detention of rakes in sidings |
| Power/loco controller | Allotment of locomotives, links, sending locomotives to sheds, relief locomotives on failure |
| Crew controller | Booking crew from the crew lobby, watching duty hours, rest |
| Coaching controller | Punctuality of passenger trains, rake links, extra coaches |
| Engineering, electrical (TPC), S&T, C&W, security (RPF) controllers | Blocks, OHE power blocks, signal failures, train examination, crime/security |
- FTO (Freight Train Operation) / rake monitoring: the position, destination, BPC validity and next plan of every loaded and empty rake.
- Unusual working: signal failure, block instrument failure, single line working (SLW), total interruption — the controller ensures that authorities and precautions are given as per the rule concerned.
- Reporting: the morning position report, punctuality, loading, interchange, immediate information about accidents/unusual incidents — "information first, details later".
- Registers/records: control chart (now electronic), caution order register, accident register, instruction book, rake detention register.
- Caution order: the location, speed and reason of temporary speed restrictions — given to the crew in writing from the station; also from control when needed.
3IT Tools of the Control Office
In simple wordsThe digital tools of the control office — COA, etc.
Operating systems
- COA — Control Office Application: electronic control chart, arrival-departure events, data to NTES
- ICMS — Integrated Coaching Management System: punctuality and rakes of passenger trains
- FOIS — Freight Operations Information System: RMS (Rake Management) + TMS (Terminal Management, e-RR)
- CMS — Crew Management System: biometric sign-on, breath analyser, duty hours
Planning and monitoring
- SATSaNG — Software Aided Train Scheduling and Network Governance (timetable management)
- RTIS — satellite-based devices in locomotives; the actual position of the train fed automatically into COA
- COIS — Coaching Operations Information System (coach position, maintenance)
- FOIS map view / dashboard (SFOORTI), Rail Sugam (for customers)
For more detail, see AFA 13.3 — systems for passengers, freight and operations.
4Coordination Between Departments
In simple wordsRunning trains needs coordination with engineering, electrical, S&T and other departments — blocks, speed restrictions.
- Engineering — track maintenance blocks, speed restrictions
- Electrical (TRD) — OHE power blocks, TPC
- S&T — signal/block failures, disconnections
- Mechanical — train examination, BPC, sick lines
- Commercial — indents, rake placement, passenger information
- RPF — alarm chain pulling, trespassing, security
Safe and punctual operation depends on this coordination. The corridor block (regular blocks in a fixed time window) and the integrated block (several departments working in the same block) are the results — they reduce the effect on trains and increase the utilisation of blocks.
5Solved Example — Analysis of Punctuality (Control Office)
ExampleIn a month, 400 mail/express trains reached their destination/divisional boundary in a division; 340 of them on time.
- Punctuality = 340 ÷ 400 × 100 = 85%;
- Causes for the 60 trains that arrived late (recorded against the main cause):
Cause Trains Responsibility/remedy Blocks for maintenance/works, speed restrictions 22 Engineering — planning corridor blocks, removing TSRs early Operating (crossing/precedence, path not available) 18 Operating — margin in the timetable, efficiency of control Asset failures (signal, OHE, locomotive) 12 S&T/electrical/mechanical — reliability, root-cause analysis External (agitations, cattle, alarm chain pulling by passengers — ACP) 8 RPF/commercial — awareness, fencing Total 60
RememberPunctuality figures now come automatically from ICMS/NTES — less scope for manual changes; but it is the correct classification of the "cause" that sets the direction of improvement.
RememberQuick revision —
- Board: Member (Operations & Business Development); zone: PCOM; division: Sr DOM and the control office.
- Control: Dy CHC (shift in-charge), section, goods, power, crew, coaching, TPC, etc.
- Systems: COA (chart), ICMS (coaching), FOIS = RMS + TMS, CMS (crew), SATSaNG (timetable), RTIS (satellite-based position).
- Caution order — written notice of a temporary speed restriction to the crew.
- Corridor/integrated blocks — less disruption, more utilisation.
Exam trap
- Head of operations in the Board — Member (Operations & Business Development); at the zone PCOM; at the division Sr DOM.
- FOIS = RMS + TMS; CMS = crew; COA = control chart — don't mix up the systems.
- Written notice of a temporary speed restriction to the crew — the caution order.