1Structure of cost
In simple wordsThe things spent directly on a job — the artisan's time (direct labour) and the material used in the job (direct material) — together make the prime cost. But the shop supervisor, electricity and the workshop office are not for any one job; they are spread over all jobs — these are called on-cost (overheads).
FormulaCost is built in three steps —
- Prime Cost = direct labour + direct material (+ direct expenses)
- Works cost = prime cost + shop on-cost + general on-cost + administrative on-cost
- Recovery from an outside party = works cost + proforma on-cost + profit + contingencies + taxes (where applicable)