1What Workshops Are For
In simple wordsJust as a car gets a major servicing every few years, locomotives and coaches are completely opened up and repaired at fixed intervals — this is called Periodical Overhaul (POH). It is done in zonal workshops. New locomotives and coaches are built in Production Units (PU).
Zonal workshops
- Periodical Overhaul (POH) of rolling stock — locomotives, coaches, wagons;
- Intermediate and accident repairs, rebuilding, modernisation;
- Manufacture of components — which go to stores;
- Work for other railways and outside parties.
Head — Chief Workshop Manager (CWM).
Production Units (PU)
- Manufacture of new locomotives, coaches, wheels and axles;
- Directly under the Railway Board; headed by a General Manager;
- Each PU has its own PFA (Principal Financial Adviser) and accounts organisation;
- Costs are worked out by batch costing (sub-topic 2).
Organisation on a zone
| Post | Role |
|---|---|
| Principal Chief Mechanical Engineer (PCME) | Directly responsible to the GM for the maintenance of rolling stock |
| Chief Workshop Engineer (CWE) | Coordination of workshops |
| CWM | Head of each workshop; shop in-charges under him |
On a zonal railway, the mechanical department's workshops sit under a clear chain of command. The Principal Chief Mechanical Engineer (PCME) is directly responsible to the General Manager for the maintenance of all rolling stock, so overall responsibility for workshops rests with him.
The Chief Workshop Engineer (CWE) coordinates the work of the different workshops — their programmes, capacity and priorities. Each workshop is headed by a Chief Workshop Manager (CWM), under whom the individual shops are run by shop in-charges. For accounts purposes, the CWM is the executive with whom the Workshop Accounts Officer deals day to day.
RememberOrder on a zone — PCME → CWE → CWM → shop; whereas a Production Unit is directly Board → GM (PU).
Rolling stock policy: specifications and design on the basis of "Life Cycle Cost" (Board and RDSO). Manufacture — Production Units, zonal workshops, outside manufacturers.
2Production Units
| Unit | Location | Main products |
|---|---|---|
| CLW | Chittaranjan (West Bengal) | Electric locomotives |
| BLW (formerly DLW) | Varanasi | Electric locomotives (WAG-9, WAP-7), Amrit Bharat locomotives, diesel locomotives for export |
| PLW (formerly DMW) | Patiala | Electric locomotives, components |
| ICF (Integral Coach Factory) | Chennai | Coaches, Vande Bharat, EMU/MEMU |
| RCF (Rail Coach Factory) | Kapurthala | LHB (Linke Hofmann Busch) coaches |
| MCF (Modern Coach Factory) | Rae Bareli | LHB coaches |
| RWF (Rail Wheel Factory) | Bengaluru (Yelahanka) | Wheels and axles |
| RWP (Rail Wheel Plant) | Bela (Bihar) | Wheels |
Production units manufacture new rolling stock and components, unlike zonal workshops, which repair and overhaul. CLW, Chittaranjan in West Bengal makes electric locomotives. BLW, Varanasi (formerly DLW) makes electric locomotives such as the WAG-9 and WAP-7, Amrit Bharat locomotives, and diesel locomotives for export. PLW, Patiala (formerly DMW) makes electric locomotives and components.
On the coach side, ICF, Chennai makes coaches including Vande Bharat trains and EMU/MEMU stock, while RCF, Kapurthala and MCF, Rae Bareli make LHB coaches. RWF, Bengaluru (Yelahanka) makes wheels and axles, and RWP, Bela in Bihar makes wheels. A common exam trap is the renaming: DLW became BLW and DMW became PLW, both now making electric locomotives.
Besides these, there are joint venture (JV) locomotive factories — Madhepura (electric locomotives) and Marhaura (diesel locomotives).
RememberLocomotives — C-B-P (CLW, BLW, PLW); coaches — I-R-M (ICF, RCF, MCF); wheels — RWF, RWP.
Production in 2025-26
| Item | Number |
|---|---|
| Total locomotives | 1,674 |
| Total LHB coaches | 6,677 |
| BLW (Banaras Locomotive Works) locomotives (highest ever) | 572 |
| ICF coaches (highest ever) | 3,405 |
| MCF coaches (highest ever) | 2,126 |
3Workshop Accounts Organisation
In simple wordsEvery large workshop has an accounts office within it — the Workshop Accounts Officer (WAO) — who works under the PFA and keeps account of the workshop's expenditure and costs.
WAO / Deputy Chief Accounts Officer (Workshop) — under the PFA, located in the workshop itself.
Functions of accounts
- Costing — work orders, cost sheets, unit costs;
- Time-keeping and labour accounts; check of incentive payments;
- Accounting of materials — issues, returns, workshop stores;
- Workshop Manufacture Suspense (WMS) — outturn statements, adjustments;
- Revision of estimates; recovery for outside work;
- Budget and review of on-cost;
- Cost reports for management.
Definition — total cost of ownershipthe total expenditure on a locomotive/coach over its whole life — purchase + all POHs + repairs. The ultimate aim of cost accounting is to know this, so that the decision "continue repairing or replace" can be taken (ERP-based).
4Information System, Investment Planning and Capacity
| Subject | Key points |
|---|---|
| WISE (Chapter 8) | Workshop Information System — arrival of rolling stock for POH, maintenance job orders, lists of work, despatch date and next POH date online; linkage with the stores system is required for materials |
| Investment planning (Chapter 10) | Plan Head 21 — Rolling Stock; 41 — Machinery and Plant (M&P); 42 — Workshops and Production Units; Rolling Stock Programme (RSP) and M&P programme with the budget; condemnation and replacement on completing codal life |
| Capacity optimisation (Chapter 11) | Full use of available capacity; work for outside parties only when there is surplus capacity (sub-topic 8) |
| Obligations towards staff (Chapters 3–4) | Workshops are now within the scope of the OSH (Occupational Safety and Health) Code 2020 — rules on safety, working hours and welfare |
Several chapters of the workshop code deal with systems and planning. WISE (Chapter 8) is the Workshop Information System: it records online the arrival of rolling stock for POH, job orders, lists of work, the despatch date and the next POH date, and is linked with the stores system. Investment planning (Chapter 10) uses three plan heads — 21 for rolling stock, 41 for machinery and plant, and 42 for workshops and production units — through the Rolling Stock Programme and the M&P programme prepared with the budget.
Capacity optimisation (Chapter 11) requires full use of the capacity available; work for outside parties is taken only when there is surplus capacity. Obligations towards staff (Chapters 3–4) now fall under the OSH Code 2020, which governs safety, working hours and welfare in workshops.
5Which Account Head Workshop Expenditure Goes To
In simple wordsIn a workshop, wages, materials and on-cost are first collected in an "in-between account" — the Workshop Manufacture Suspense (WMS). When the job is complete, the cost moves from there to the head for which the work was done — locomotive repairs, coach repairs, a new asset, or an outside party.
| Work | Final head |
|---|---|
| POH/repairs of locomotives (motive power) | Revenue — SMH 03 (motive power — repairs and maintenance; Abstract C) |
| POH of coaches/wagons | Revenue — SMH 04 (carriages and wagons — repairs and maintenance; Abstract D) |
| Repairs of plant/equipment | Revenue — SMH 05 (Sub-Major Head) |
| Manufacture of components for stores | Stores Suspense (stock in depot) — then the user on issue |
| New asset (capital work) | Capital/DRF/DF — the work concerned |
| Work for an outside party | Recovery from the party (adjusted against the advance deposit) |
Workshop expenditure is first collected in Workshop Manufacture Suspense and then cleared to the head that represents what the work was for. POH and repairs of locomotives go to revenue SMH 03 (motive power — repairs and maintenance), and POH of coaches and wagons to SMH 04 (carriages and wagons — repairs and maintenance). Repairs of plant and equipment go to SMH 05.
Components made for stores go first to Stores Suspense as depot stock and are charged to the user when issued. A new asset is charged to Capital, DRF or DF, as the work concerned is financed. Work for an outside party is recovered from that party, adjusted against its advance deposit. The rule is simple: the final head follows the purpose of the work, not the shop in which it was done.
ExampleIn a month, a workshop spent ₹5 crore — wages ₹2 crore, materials ₹2.2 crore, on-cost ₹0.8 crore — all first to WMS. That month the POH of 30 coaches was completed (₹3.6 crore) → SMH 04; POH of 2 locomotives (₹0.9 crore) → SMH 03; components worth ₹0.3 crore to stores → Stores Suspense. The remaining ₹0.2 crore will stay in WMS as work-in-progress.
6Internal Check by the WAO — What Is Examined
| Area | Points of check |
|---|---|
| Time-keeping | Matching attendance (gate) with time on jobs (job cards); analysis of idle time; sanction for overtime |
| Incentive | Sanction of allowed time (AT), time taken (TT), limit of profit %, review of unusually high profits (sub-topic 6) |
| Materials | Issue notes as per the work order; consumption above the standard; prescribed proportion of scrap; credit for returned material |
| Work orders | Sanction, expenditure above the Estimate, timely closure, old open work orders |
| WMS | Analysis of the balance, long-pending items, timely transfer to the final head |
| Outside work | Advance deposit, proforma on-cost, recovery of actual cost |
| Machinery | Utilisation of M&P, idle machines, cost of repairs |
The Workshop Accounts Officer's internal check covers every area where workshop money can leak. In time-keeping, gate attendance is matched with time booked on job cards, idle time is analysed and overtime sanction is checked. In incentive, the allowed time, time taken and the profit limit are checked, and unusually high profits are reviewed.
For materials, issue notes must agree with the work order, consumption above standard is questioned, scrap must be returned in the prescribed proportion, and returned material must be credited. Work orders are checked for sanction, expenditure above the estimate, timely closure and long-open orders. The WMS balance is analysed for long-pending items. Outside work needs an advance deposit, proforma on-cost and recovery of actual cost, and machinery is examined for utilisation, idle machines and cost of repairs.
7Indicators of Workshop Performance
In simple wordsWhether a workshop is doing well shows up in a few figures: how many units came out, how many days they took, what they cost, and how many man-hours were used.
| Indicator | Meaning | Good when |
|---|---|---|
| Out-turn | Units turned out after POH in a month/year | Equal to or above target |
| Workshop days / cycle time | How many days a unit stayed in the workshop | Low |
| Unit repair cost (URC) | POH cost per unit (sub-topic 2) | Below/equal to the standard |
| Man-hours per unit | Labour productivity | Low |
| Ratio of on-cost to direct labour | Burden of indirect expenses | Low |
A workshop's performance is judged by a handful of indicators. Out-turn — the number of units turned out after POH in a month or year — should equal or exceed the target. Workshop days or cycle time — how long a unit stays in the workshop — should be low, because every day in the shop is a day lost to traffic.
The Unit Repair Cost should be at or below the standard, and man-hours per unit should be low, showing good labour productivity. The ratio of on-cost to direct labour should be low, since a high ratio means indirect expenses are heavy relative to productive work. For example, a coach workshop that turns out its target of 100 coaches but takes 18 days each instead of 14 is meeting volume but keeping stock out of service too long.
ExampleIn a workshop, the POH of a coach took 24 days on average last year and 20 days this year → coaches returned to service sooner; this means more passenger service from the same number of coaches, i.e. fewer "ineffective" coaches.
Summary table
| Point | Key facts |
|---|---|
| Code | Rolling Stock Code October 2022 (formerly the Mechanical Department (Workshops) Code) |
| Workshops | POH, accident repairs, components, outside work; headed by the CWM |
| Zone | PCME → CWE → CWM |
| PU | Directly under the Board; headed by a GM; own PFA; batch costing |
| Locomotives / coaches / wheels | CLW, BLW, PLW (Patiala Locomotive Works) / ICF, RCF, MCF / RWF, RWP; JV — Madhepura, Marhaura |
| 2025-26 | 1,674 locomotives; 6,677 LHB coaches; BLW 572; ICF 3,405; MCF 2,126 |
| Accounts | WAO — under the PFA; costing, time-keeping, materials, WMS, incentive, Estimates, on-cost |
| Plan Heads | 21 rolling stock, 41 M&P, 42 workshops/PUs |
| WISE | Online management of POH; linkage with the stores system |