In simple wordsEvery fact asked in the Railway Board Appendix-IIIA question bank (Traffic part) is gathered here topic-wise. Practice questions for each fact are in the "Question bank (complete)" sets of the Appendix-3A module. Where the bank's key is outdated or self-contradictory, the correct/current position is noted.
1Goods — free time and demurrage
Key free-time figures
| Situation | Free time / rule |
|---|---|
| BCNHL mini rake loading/unloading | 5 hours |
| Double operation of container commodity by sling cranes | 8 hours |
| Coal/iron-ore rakes — reduced | 3 hours (PCCM with PCOM; two weeks' notice to terminals) |
| Bagged consignment in open wagons at EOL sidings | 6 hours |
| Sick/unfit wagon | 24 hours beyond permissible free time |
| BG and MG wagons | Same free time |
| Separate free time / block-rake allowance | Only the seven old steel plants |
- EOL (Engine on Load) — the engine stays with the customer during free time. Private/assisted sidings do not work on EOL.
- Demurrage is charged on the whole rake (group); free time and demurrage are linked with the siding's handling capacity.
- "Dies-non" hours are deducted. For night incentive, night = 22:00 to 06:00.
- Debit-Credit system — only customers giving at least 1 MT a year; adjustment monthly.
Rates
- Demurrage: Rs 150 per 8-wheeled wagon per hour or part. Parcel van (VP) also Rs 150 per hour.
- Coal/coke rake excess detention: up to 4 h 2×, 4–8 h 2.5×, beyond 8 h 3× base rate.
- Goods-shed groups for wharfage — monthly average more than 12 rakes = Group I, exactly 12 = Group II (fewer = Group III). Bank rates: Group I Rs 150, II Rs 120, III Rs 75 per wagon per hour.
- Free time for removal of goods (after unloading free time, bank key): Group I 12, Group II 15, Group III 30 working hours.
- Normal goods-shed hours 06:00–22:00; round-the-clock working case by case by the DRM.
Waiver — SOP
| Authority / rule | Limit |
|---|---|
| HOD (CCM/FM or CCM/FS) | Wharfage Rs 50,000 per consignment; demurrage Rs 50,000 per wagon |
| GM | Full powers (cases routed through coordinating HOD Commercial and PFA) |
| Prior finance concurrence | Waiver above Rs 25,000 |
| First application | Within 10 days to SM/CGSR |
| Appeals | Maximum 2; within 30 days; SM/CGSR forwards in 3 days |
- The Remission Order supports the waived amount and appears on the credit side of the balance sheet.
- No waiver of detention charges for load adjustment of overloaded wagons.
Sidings, shunting, stabling
- Siding charge minimum one hour; shunting charges rounded at the end of ten days; levied on actual performance at engine-hour cost (all-India electric engine-hour cost is used for shunting and trip charges).
- Rakes held on the network by siding owners for want of room — stabling charge; also for detaining privately owned wagons.
- Private siding — no limit on co-users; Sr. DCM signs the agreement; weighbridge on railway land — DRM permits; weighbridge maintenance — Mechanical department.
- Assisted siding — cost shared by Railway and party; agreement required; party pays interest and maintenance.
Exam caution: Demurrage = detaining the Railway's wagon; wharfage = goods lying on railway premises; stabling = holding the rake on the line.